Preliminary AI research tool. Reports are generated from public GIS data and do not constitute professional planning advice, legal opinion, or a guarantee of regulatory outcomes. Independent verification by a licensed Ontario planner, engineer, and legal counsel is required before any development application or investment decision.

Feasibility research for any Ontario property, in under 2 minutes

Enter an address. LandIQ checks zoning, the Official Plan, conservation authority mapping, servicing, provincial highway corridors and nearby development activity, then writes it up as a preliminary report with links to verify each finding.

Your first report is free. Create an account to run it.
Illustration of an example parcel. Every report maps the property and lists what applies to it, with a link to check each item at the source.
Researching this property
1
Locating address & geocoding
2
Querying GIS constraint database
3
Running QA/QC validation
4
AI property research
5
Generating AI due diligence report
Starting analysis... 0%
What LandIQ is checking
Environmental constraints
Floodplains, wetlands, natural heritage, Greenbelt & ORM
Zoning
By-law research, permitted uses & amendment requirements
Official Plan designation
Municipal OP policies, intensification targets & Growth Plan
Servicing
Municipal water, sanitary sewer & stormwater availability
Approval pathway
Required studies, agency contacts & sequential approvals
Automated quality checks
Constraints that look doubtful are flagged for you to verify
50+
GIS Data Sources
Ontario-Wide
Coverage
<2 min
Report Generation
AI + GIS
Dual Intelligence
What each report covers
Environmental constraints
Floodplains, wetlands, natural heritage, Greenbelt & ORM
Zoning
By-law research, permitted uses & amendment requirements
Official Plan designation
Municipal OP policies, intensification targets & Growth Plan
Servicing
Municipal water, sanitary sewer & stormwater availability
Approval pathway
Required studies, agency contacts & sequential approvals
Automated quality checks
Constraints that look doubtful are flagged for you to verify
50+
GIS Data Sources
Ontario-Wide
Coverage
<2 min
Report Generation
AI + GIS
Dual Intelligence

How a report is made

LandIQ pulls together the public mapping and municipal documents you would otherwise check one portal at a time, then summarises them in a consistent format.

1

Enter an address

Type a full civic address, intersection, or paste raw coordinates. LandIQ geocodes the location precisely using dual geocoding engines.

2

Check the mapping

Your property coordinates are cross-referenced against 50+ public Ontario GIS layers — environmental constraints, zoning, CA regulated areas, and provincial overlays.

3

Research and checks

Automated QA/QC flags suspicious constraints. AI researchers then look up live zoning by-laws, Official Plan designations, and servicing availability for the specific address.

4

Read the report

A full AI-written due diligence report is generated — complete with risk dashboard, constraint analysis, required studies, approval pathways, and agency contacts. Exportable as PDF.

Under 2 minutes for research that usually means hours of portal lookups and by-law reading. Treat it as a starting point and confirm key items with the municipality and agencies.

Where the data comes from

Public Ontario GIS sources at three levels: provincial, conservation authority and municipal. Where local mapping is not available, live research of municipal documents fills the gap and the report says so.

Provincial Layers
Province-wide coverage
  • Greenbelt Plan Area & Designation
  • Oak Ridges Moraine (Planning Area & Land Use)
  • Niagara Escarpment Plan & Boundary
  • Natural Heritage System
  • Lake Simcoe Protection Plan Boundary
  • Provincially Significant Wetlands
  • Prime Agricultural Areas
  • Provincial Aggregate Resource Areas
  • Ontario Heritage Properties
  • Registered Archaeological Sites
  • Provincial Parks & Conservation Reserves
Conservation Authorities
Regulated area & watershed layers
  • TRCA — Toronto & Region CA
  • LSRCA — Lake Simcoe Region CA
  • CVC — Credit Valley Conservation
  • Conservation Halton
  • CLOCA — Central Lake Ontario CA
  • HCA — Hamilton Conservation Authority
  • GRCA — Grand River CA
  • NPCA — Niagara Peninsula CA
  • UTRCA — Upper Thames River CA
  • NVCA — Nottawasaga Valley CA
  • RVCA — Rideau Valley CA
  • LPRCA — Long Point Region CA
Municipalities
Zoning & Official Plan layers
  • City of Toronto
  • York Region (Markham, Vaughan, Richmond Hill…)
  • Region of Peel (Mississauga, Brampton)
  • Halton Region (Oakville, Burlington)
  • Durham Region (Oshawa, Whitby, Ajax…)
  • City of Hamilton
  • Region of Waterloo (Kitchener, Cambridge)
  • City of Guelph
  • City of London
  • Simcoe County (Barrie, Bradford, Collingwood…)
  • Niagara Region (Niagara Falls, St. Catharines)
  • City of Ottawa + City of Kingston
  • Greater Sudbury + more
Coverage across Ontario
Coverage is continuously expanding. For addresses outside current GIS coverage, AI will conduct live web-based lookups of municipal by-laws, zoning by-laws, and planning policies to complete the report.
Property
Risk Dashboard
Zoning Certainty—
Environmental Risk—
Regulatory Complexity—
Timeline Risk—
MTO Controlled Area—
Overall Risk—
Complexity Index —
Low (1–3)Moderate (4–7)High (8+)
Parcel Metrics
Triggered Constraints
LandIQ — AI Due Diligence Review
Date
Coords
Layers
⚠
Preliminary automated analysis only. Does not constitute professional planning advice or a guarantee of regulatory outcomes. All findings require independent verification by a licensed Ontario planner, engineer, and legal counsel before any development application or investment decision.
Disclaimer: This is a preliminary automated analysis based on publicly available GIS data from Ontario Conservation Authorities, Land Information Ontario, and municipal sources. It does not constitute professional planning advice, legal opinion, or a guarantee of regulatory outcomes. Site-specific professional review is required prior to any development application. AI-generated — all findings require independent verification by a licensed Ontario planner, engineer, and legal counsel.